Power Conservation
Hospital has initiated several power conservation methods to conserve electricity.
Changes to Electrical installation to conserve power
Changes to HVAC installation to conserve Power
Sr.No |
Description |
Action taken |
Energy savings |
Energy savings per day |
Energy saving per year 364days at 8 Rs /unit |
1 |
Cooling tower no1 Cooling tower no2 Cooling tower no3 |
Cooling tower has been replace -2nos of 10 hp/7.5 kw motor to 1no motor of 12.5hp/10kw. |
5 Kw/Hr |
An average working of cooling tower per day 12 hrs =60 kw/day |
21,840kw/year RS 1,74,720 |
2 |
Radiology 2nos of AHUs 35TRwith 12,5hp/10kw motor & 10hp/7.5 kw motor working contentiously in day time |
Inter connected the ducting of 2 AHU s and switched off one AHU permanently. |
7.5kw /Hr |
An average working of AHU per day is 12 hrs =90 kw/day |
32,760kw/year RS 2,62,080 |
3 |
CTVS ICU and neuro ICU |
100% Fresh air system converted into 70% Fresh air 30 % Recirculated air system with out effecting the standards. Disconnected 10hp/7.5 kw exhaust blower and Heat Recovery wheel of around 0.5 kw |
8kw/hr |
ICU works 24 hrs per day 192kw/day |
69,888/year RS 5,59,104 |
4 |
MS.OT -4nos |
100% Fresh air system converted into 70% Fresh air 30 % Recirculated air system with out effecting the standards. Disconnected 1hp/.75 kw exhaust blower and Heat Recovery wheel of around 0.25kw |
1kw/hr |
OTis working around 12 hrs per day 12kw /day |
4,368kw/year 34,944 |
5 |
VFDs for Cath lab AHU-30TR-12.5HP/10KW CCU AHU-30TR010HP/7.5KW Labor room AHU-30TR-10HP/7.5KW CTVS ICU -15HP/12.5KW Neuro ICU-15HP/12.5KW
|
By introducing the VFDs in different location AHUs the efficiency improved in AHUs and an average and overall 0.5 kw has been saved . |
3kw/hr |
An average working AHUs all together 15Hrs/day 45kw/day |
16,380kw/year 1,31,040 |